Click for full size
Here is the distribution box with the loops of fiber. The tech just left some rolled up fiber near the ground.
Click for full size
Here is a view of the cable left on the bottom of the pole.
Click for full size
The distribution box with several loops of fiber hanging around it. The cable hanging down is part of the loop on the ground.
Click for full size
This is a close up of the cable on the ground.
Verizon first came to my neighborhood about a month ago to start installing fios in town. They put up the large, beige distribution box at the beginning of my street along with several spools of fiber optic cable left hanging there. They left it that way for about 3-4 weeks, then they returned to do more work this past wednesday. The past few days just one truck shows up around 8:00am EST and leaves around noon. The guy has made some progress over the past three days. Here are some pictures of the work that has been done:

nevin

join:2009-07-31
North Attleboro, MA

Click for full size
Here is the truck working in front of my house putting up the box.
Click for full size
Here is a picture of the box just installed today. (Under the streetlight) Does anyone know what it does?
Click for full size
Another, close pic of the box.
The tech also installed a small box on the wires today in front of my house, can anyone tell me what this box is/does. Also, based on the pictures in this and the above post could anyone possibly tell me how much longer it might be until the fios service is ready in my neighborhood?

jophan
Premium
join:2009-07-12
Jenkintown, PA

reply to nevin
The larger box hanging off the wires is a splice case that covers the connection between one cable and another. The tiny box should have angled connectors (I can't see on the picture) which will be the actual terminal; each connector is reserved for a customer.

My neighborhood had the hub placed in late March, the splicing done in June, and we were able to order service in early July. So I'd say (barring unpredictable trouble) you have only a month or two to wait.

JohnA
Premium
join:2003-09-16
Pittsburgh, PA
reply to nevin

That's an FDT. Your drop connector will plug into the end of it.

nevin

join:2009-07-31
North Attleboro, MA

reply to jophan
said by jophan See Profile :

The larger box hanging off the wires is a splice case that covers the connection between one cable and another. The tiny box should have angled connectors (I can't see on the picture) which will be the actual terminal; each connector is reserved for a customer.
I'd just like to know what "tiny box" you're referring to, the ones to the right and left of the pole have been there long before FiOS came along. Also, is there any difference between the rectangular "FDT" and the ones that are circular in shape that verizon uses, which I have also heard referred to as splice cases.

viafax999

join:2000-06-03
Westford, MA

reply to nevin
said by nevin See Profile :

Also, based on the pictures in this and the above post could anyone possibly tell me how much longer it might be until the fios service is ready in my neighborhood?
Depends what concessions your town management tries to wring out of verizon.
We're in Westford MA. They completed the wiring here in April/May. Nothing has happened since and Verizon still says no availability.
I believe Tyngsboro MA waited in that state for 18 months as the town management couldn't come to agreement with Verizon over what they wanted.

nevin

join:2009-07-31
North Attleboro, MA

»www.thesunchronicle.com/articles···7065.txt

Well, according to this article the selectmen in the town did vote and approved verizon's cable license/permit, plus verizon will add the surcharge that will go toward supporting the cable access station (North TV) which I'm sure is a positive for them since it seems comcast doesn't do that. It seems it was unanimously approved. So aside from verizon matching comcast's provisions dollar-for-dollar, plus adding the 4.5% surcharge, are there any other concessions that the town may be looking for that I'm unaware of that could delay the process of making fios available to residents in North Attleboro?

viafax999

join:2000-06-03
Westford, MA
Looks like you are good to go, wish our town management could be so proactive.
Did you try the Verizon Fios page to see if they are showwing availability or taking pre-orders?

nevin

join:2009-07-31
North Attleboro, MA

Several weeks ago I got a postcard in the mail saying fios is on the way. Checking for availability on verizon's website still says not available. And, according to this PDF: »www22.verizon.com/about/communit···0809.pdf we aren't yet on the official list of towns in which fios is available, but at the bottom it says it will soon be available.

nevin

join:2009-07-31
North Attleboro, MA

JJ1234, I see that you posted a topic asking whether fios had been cancelled in north attleboro or not. The response to your question directed you to this thread, if you do find your way here (which you did if you are reading this) could you let me know where you heard this horrible news? The pictures that I posted above are what it still looks like on my street, no progress has yet been made on this since last Friday, so unless it has been a recent decision to cancel fios, it seems to be still on.


Mx

@comcast.net

I talked with one of the verizon installer guys and fios is on hold in Attleboro because town officals are dragging their feet on some issues. Verizon was going full force on the install and should have been done by end of aug or mid sept but now it's not clear when it will be ready since they don't know when Attleboro will start moving on this.

(I tried calling the town hall and anyone that could get me info on this was either on vacation or not around today. If anyone knows someone that works for the town maybe they can find out what the hold up is.)

nevin

join:2009-07-31
North Attleboro, MA

This sucks, the town better get moving with this, because it's just ridiculous. Is the install held up in both attleboro and north attleboro? Well, it would be great if you (or anyone else) could get a hold of someone in town hall who knows the status of fios and what the issues are, if the damn town is looking for more money I say they should just sell that painting! They make so much money from so many things us residents are charged for and fios deployment shouldn't be stopped due to the pathetic town's financial woes.

nevin

join:2009-07-31
North Attleboro, MA

reply to nevin
Click for full size
Click for full size
This is an update to my original posting of the pictures of what the installation of fios in my neighborhood looks like. Correct me if I'm wrong.... but I believe the two devices on he ground are splice cases. What is the purpose of these? Also, any additional information is greatly appreciated!

JohnA
Premium
join:2003-09-16
Pittsburgh, PA


The HUB mounted on the pole appears to be a 216 service HUB. On it's back is a black triangular shaped wedge. There are 2 fiber segments (tails if you will) coming out of that wedge. The smaller (diameter) fiber is the incoming to the HUB, and is spliced to the incoming to the HUB from the CO, in the smaller splice case. The outgoing from the HUB, a 216 fiber cable, is spliced to all the outgoing (to the neighborhoods) fiber segments in the larger splice case.

Those 2 tails, the CO incoming, and all the outgoing to service addresses, are left long enough to be pulled into a splicers van, while the splicing occurs.

After all splicing and testing are done, the segments hanging down with splice cases, are pulled up to the wire and lashed in place.

nevin

join:2009-07-31
North Attleboro, MA

reply to nevin
There was some more verizon work done on my street today. Today a large van (which I've never seen before) was working on the splice cases (of which there are pictures of above). Here is a picture that I found online of the van that was on my street today. Can somebody tell me what this van was doing or your best guess as to what work was being performed? Also, how much longer do you think it will be until the service is ready??


sonofjay
Mission Accomplished - Bush May 1, 2003
Premium,MVM
join:2001-05-14
North Attleboro, MA
·Vonage
·Earthlink Cable Mo..

I live in NA and that van was parked on our street for 5 days (8 hours a day) working on the splice. That was in May and there is no signs of service yet. Also, if you drive around NA you'll see there are a few places where there are poles (like you have pictured above) with the cable "hubs" are laying on the ground tied to the poles and have been that way for 4-5 weeks now.

VZ told the paper/town that it expected to go live on Fios end of June, early July. Obviously plans have changed.

Bottom-line I wouldn't hold your breath that you'll be getting service anytime soon just because you now see the "splice truck" in front of your place.
--
Mission Accomplished

JohnA
Premium
join:2003-09-16
Pittsburgh, PA

said by sonofjay See Profile :

there are a few places where there are poles (like you have pictured above) with the cable "hubs" are laying on the ground tied to the poles and have been that way for 4-5 weeks now.
The HUB is the almond colored box up on the pole. Those are splice cases on the ground. Some areas put them back up on the wire every night, and some leave them on the ground so there is no bucket truck needed to bring them down in the morning and put them back up at night.


sonofjay
Mission Accomplished - Bush May 1, 2003
Premium,MVM
join:2001-05-14
North Attleboro, MA
·Vonage
·Earthlink Cable Mo..

Apologize, don't know the terminology nor name of the equipment. Was responding to OP's question as to how much longer after seeing "splice" truck that that service would be available. Thanks for the clarification.
--
Mission Accomplished

nevin

join:2009-07-31
North Attleboro, MA

reply to nevin
So, basically, I shouldn't expect fios to be available anytime soon?? Also, as I do know most of the terminology for the equipment up on the poles, I am unclear as to what exactly splicing is and what it does. Could anyone explain the concept to me and why it takes so long!

jfpatrick

join:2002-03-15
Leominster, MA
·Verizon Online DSL

reply to nevin
Verizon has been saying "we'll slow expansion / upgrades" as a result of now having local property taxes applied to their equipment and telephone poles.

The property tax adjustment means at least $1 million more for the City of Boston. No doubt other cities and towns will also assess for property taxes. In the end, the consumer will pay.
-
Forums » US Telco Support » Verizon » Verizon Fiber OpticsFIOS scheduled for Bronx NY yet? »
« [northeast] Random hangs on websites  
page: 1 · 2 · 3 · 4


Sunday, 29-Nov 07:34:55 Terms of Use | Privacy Policy | Hosting by www.nac.net - DSL,Hosting & Co-lo | feedback | contact
over 10 years online! © 1999-2009 dslreports.com.
page compression OFF
Most commented news this week
· [122] Time Warner Cable Fires Broadside At Broadcasters
· [112] New AT&T Ad Campaign Hits Back At Verizon
· [96] Apple Joins AT&T Verizon Snark Fest
· [87] New Bill Takes Aim At Higher Verizon ETFs
· [80] TiVo Sees Record Customer Losses
· [73] Weekend Open Thread
· [72] Verizon CEO: Hulu Will Be Dead Soon
· [69] In-Flight Internet Headed For Bumpy Landing?
· [62] Thanksgiving Open Thread
· [40] EFF Wages War On Fine Print
Most people now reading
· Windows 7 boot manager editing questions [Microsoft Help]
· 3.x Feral Druid - Bear Tanking Guide [World of Warcraft]
· ToC 4th boss - Preliminary Strategy for Twin Valkyr [World of Warcraft]
· Blue Ray: Samsung BD-P3600 or LG BD390 [Audio/Video Chat]
· [Snow Leopard] NFS Mounts - no more Directory Utility [All Things Macintosh]
· [How to] Install Asterisk on an Asus WL-520GU router [VOIP Tech Chat]
· Goodbye, Acronis... Hello ShadowProtect! [Software]
· Using DIR-615 C1/3.01 with Trendnet TEW-652BRP in N Mode [D-Link]
· Digital Transport Adapter Unboxing Photos [Comcast Cable TV]
· [WIN7] Outlook express under Windows 7? [Microsoft Help]